Home » Server Options » Data Guard » failover standby Rac (Oracle 10.2.0.4.0, Centos 4.5)
failover standby Rac [message #473121] Thu, 26 August 2010 02:34 Go to next message
kumarrajnishgupta
Messages: 43
Registered: October 2008
Location: noida
Member

Hi Friends,

In my production -- we have 3 nodes Primary RAC with 2 Nodes Physical secondary Standby RAC. Due to some reason we will have to failover means 3 nodes Primary Standby RAC to 2 Nodes secondary physical Standby RAC. So please share Steps for Failover ( not switchover) from 3 Nodes Primary RAC to 2 Nodes Physical Standby RAC. I know this is generic and can be find from google but issue is how can failover from 3 nodes primary standby rac to 2 nodes secondary physical standby rac.

Regds
Rajnish
Re: failover standby Rac [message #473285 is a reply to message #473121] Fri, 27 August 2010 04:38 Go to previous messageGo to next message
kumarrajnishgupta
Messages: 43
Registered: October 2008
Location: noida
Member

Hi friends


sorry for requesting to reply on mail. I know you people can say if i am in hurry then contact to oracle. But still requesting you kindly suggest me failover steps in RAC Env.

Redgs
rajnish
Re: failover standby Rac [message #473291 is a reply to message #473285] Fri, 27 August 2010 05:16 Go to previous messageGo to next message
John Watson
Messages: 8922
Registered: January 2010
Location: Global Village
Senior Member
It is perfectly straightforward: shutdown all instance except one, and then ALTER DATABASE ACTIVATE STANDBY DATABASE as usual.
Re: failover standby Rac [message #473520 is a reply to message #473291] Sun, 29 August 2010 22:51 Go to previous message
kumarrajnishgupta
Messages: 43
Registered: October 2008
Location: noida
Member

HI Friends

Not able to get. could you please write down the steps.

Regd
Rajnish
Previous Topic: TNS-01189: The listener could not authenticate the user
Next Topic: Log apply is not done on physical standby database
Goto Forum:
  


Current Time: Thu Mar 28 04:36:35 CDT 2024